MIL-DTL-44258B
4.4.1 Electrical continuity for cable assemblies. Each conductor in the electrical cable assembly
shall be tested in accordance with UL 817 paragraph 101.2. Measurement shall be made between
connector pins which are mutually common to each other electrically. The continuity for each pin
shall be checked for compliance with the continuity requirement of 3.6 and 3.8. Failure to comply
shall be considered a test failure.
4.4.2 Insulation resistance for cable assemblies. The cable assembly shall be tested in accordance
with UL 817 paragraph 87. Insulation resistance measurement shall be made between the
mutually insulated points and between insulated points and connector shell or ground. Each
resistance measurement shall be checked for compliance with the continuity requirement of 3.6
and 3.8. Failure to comply shall be considered a test failure.
4.4.3 Electrical continuity of distribution boxes. Each circuit in the electrical distribution box
shall be tested for continuity. The continuity for each pin shall be checked for compliance with
the continuity requirements of 3.7. Failure to comply shall be considered a test failure.
5. PACKAGING
5.1 Packaging. For acquisition purposes, the packaging requirements shall be as specified in the
contract or order (see 6.2). When actual packaging of material is to be performed by DoD
personnel, these personnel need to contact the responsible packaging activity to ascertain requisite
packaging requirements. Packaging requirements are maintained by the Inventory Control Point's
packaging activity within the Military Department or Defense Agency, or within the Military
Department's System Command. Packaging data retrieval is available from the managing Military
Department's or Defense Agency's automated packaging files, CD-ROM products, or by
contacting the responsible packaging activity.
6. NOTES
(This section contains information of a general or explanatory nature which may be helpful, but is
not mandatory.)
6.1 Intended use. The electrical distribution assemblies are designed to supply adequate electrical
power to lighting fixtures and to the electrical outlets of the TEMPER.
6.2 Acquisition requirements. Acquisition documents must specify the following:
a. Title, number, and date of this document.
b. Type of electrical distribution assembly required (see 1.2).
c. Issue of DoDISS to be cited in the solicitation, and if required, the specific issue of
individual documents referenced (see 2.3).
d. First article, if required (see 3.1).
7
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business